Flow-Quip, Inc. provided twelve automated hydraPAK actuators for installation at remote valve sites along Overland Pass Pipeline's 750-mile natural gas pipeline. Each pipeline gate valve is fitted with Flow-Quip's hydraulic actuator, which is powered by its on-site hydraulic power pack.