Fri10312014

Last updateFri, 31 Oct 2014 11am

Prosperity in the Age of Decline

Prosperity in the Age of Decline

In his address to VMA’s Annual Meeting in Septembe...

Understanding and Choosing Waterworks Valve Flanges

Understanding and Choosing Waterworks Valve Flanges

PART TWO: Construction and Installation

(Ed. Note: ...

Market Outlook 2015: Oil Joins Gas in the Spotlight

Market Outlook 2015: Oil Joins Gas in the Spotlight

Natural gas returned as star of the show at the 20...

VALVE Magazine Print & Digital

Subscribe14FALLRead the latest digital edition

Subscribe to the digital edition

Subscribe to the print edition

Subscribe to the biweekly VALVE eNews

BUYERS GUIDE 300x80

New Products

Industry Headlines

Advertisement
Advertisement

Emerson Supplying Second-Largest Wastewater Treatment Plant in the United States

Massachusetts Water Resources Authority has selected Emerson Process Management to replace outdated HMI (human machine interface) systems at the Deer Island Wastewater Treatment Plant with its Ovation technology. The new interface will make it easier for operators to effectively control daily operation and help ensure regulatory compliance.

The Deer Island Treatment Plant, in operation since 1995, is the second-largest wastewater treatment plant in the United States. It serves 43 Boston-area communities and is the centerpiece of MWRA’s $3.8 billion program to protect Boston Harbor against pollution from the metropolitan area’s sewer systems.

Source: Emerson Process Management

View Full Article

VIDEO HOME PAGE

  • Latest

  • Popular

  • Links

  • Events

 

Valve Magazine Digital Edition

14 SUM CVR 160x214Inside the Summer 2014 issue…

• Attracting Talent
• Advances in Machining
• Severe Service in Power Plants
• SIS Tests and Standards

CLICK HERE TO REQUEST YOUR
DIGITAL EDITION PREVIEW EMAIL

buy winstrol oral oral winstrol dosage define anabolic steroids musclepharm diet buy anabolics online