Sat04182015

Last updateWed, 15 Apr 2015 4pm

Best Practices in New Product Development

Best Practices in New Product Development

The energy industry is entering into increasingly ...

LNG: State of the Market

LNG: State of the Market

Natural gas production in the U.S. has increased s...

Forgings: Higher Quality with a Cost

Forgings: Higher Quality with a Cost

While the words “cast” and “steel” often go togeth...

VALVE Magazine Print & Digital

Subscribe WNT15Read the latest digital edition

Subscribe to the digital edition

Subscribe to the print edition

Subscribe to the biweekly VALVE eNews

BUYERS GUIDE 300x80

New Products

Advertisement

BP Aims to Stop Gulf Well Leak by Installing Valve

BP Plc is trying to install a valve to stanch one of three leaks in an undersea Gulf of Mexico well as it works on longer-term solutions, including installing a dome to capture the flow and drilling a relief well to plug it.

An oily sheen from the leak reached the Louisiana shore today in the area of the Chandeleur Islands, a group of barrier islands about 70 miles east of New Orleans, said Matthew Schofield, spokesman for the U.S. Coast Guard. The sheen was confirmed at 4 a.m. local time, he said.

Source: Bloomberg

View Full Article

VIDEO HOME PAGE

  • Latest

  • Popular

  • Links

  • Events

 

Valve Magazine Digital Edition

15 WNT CVR 160x214Inside the Winter 2015 issue…

• Your Control Systems Are at Risk!
• Building a Better Workforce
• Focus on the Offshore Market
• Forgings: Quality with a Cost

CLICK HERE TO REQUEST YOUR
DIGITAL EDITION PREVIEW EMAIL

buy steroids in usa clenbuterol 0.02mg clomid only cycle sustanon 250 profile buy anabolic steroids greece