Published

Curtiss-Wright Awarded Contracts from TerraPower for Natrium Plant

The contracts are to design and supply plan simulation and digital control solutions.

Share

Curtiss-Wright Corporation has been awarded two contracts from TerraPower to design and supply plant simulation and digital control solutions for the Natrium advanced nuclear reactor design.

Under the contracts, Curtiss-Wright will design and deliver the Training Simulator (TSN) and Distributed Control Systems (DCS) for the Natrium plant. The TSN is a full-scope simulator replicating plant equipment and simulating system conditions and operations to support operator training and licensing. The DCS is a digital platform that serves as a core component for automating control and operation of plant processes. In addition, Curtiss-Wright has been selected to develop two separate control systems for the Natrium plant: the NIC (Nuclear Island Control system) and EIC (Energy Island Control system).

Under previously awarded contracts, Curtiss-Wright was selected to develop the Reactor Protection System (RPS) for the Natrium plant and the software platform and engineering services for the Natrium Engineering Simulator.

“We are excited to support TerraPower in the development of its next-generation Natrium reactor design,” said Lynn M. Bamford, chair and CEO of Curtiss-Wright Corporation. “Curtiss-Wright continues to build on its heritage as one of the leading global suppliers of nuclear reactor technologies, growing both organically and through acquisitions, and we remain in a strong position to support TerraPower in its efforts to decarbonize the existing energy infrastructure through the creation of clean, reliable and affordable energy.”

In 2020, TerraPower was selected by the U.S. Department of Energy’s Advanced Reactor Demonstration Program (ARDP) to receive initial funding as part of a $3.2 billion program to develop and build advanced nuclear reactors.

TerraPower's Natrium reactor is a 345-megawatt sodium fast reactor coupled with breakthrough innovation — a patented molten salt energy storage system, providing built-in gigawatt-scale energy storage. The Natrium technology’s advanced design enables simultaneous production of carbon-free electricity, heat and steam to support decarbonization of power and industrial sectors. TerraPower is building its first reactor in Kemmerer, Wyoming, and its first Natrium plant is expected to be online in 2030.

For more information about Curtiss Wright’s nuclear division at www.cwnuclear.com.

RELATED CONTENT